Monday, 23 April 2012 09:04

Creating a new target using PBLs from existing targets

On stackoverflow a poster asked if its possible to create a new target using an existing application object or different application object. While the question wasnt very clear, the answer is an interesting look into the issues that will be encountered when doing the above.

Check out the full post on StackOverFlow

Read 8248 times